How can I get quote?
- Detailed drawings (PDF/STEP/IGS/DWG...) with material, quantity and surface treatment information
Can I get a quote without drawing?
- Sure, we appreciate to receive your samples, pictures or drafts with detailed dimensions for accurate quotation
Will my drawings be
divulged if you benefit?
- No, we pay much attention to protect our customers’ privacy of drawings, signing NDA is also accepted if need
How about the lead time?
- Generally, 1-2 weeks for samples, 3-4 weeks for mass production
How do you control
the quality?
- Material inspection--Check the material surface and roughly dimension.
Production first inspection--To ensure the critical dimension in mass production.
Sampling inspection--Check the quality before sending to the warehouse.
Pre-shipment inspection--100% inspected by QC assistants before shipment.
What will you do if we
receive poor quality parts?
- Please kindly send us the pictures, our engineers will find the solutions and remake them for you asap
What's your MOQ?
- Our moq is 1 piece
How can I get a sample
for quality check?
- After quotation, if needed, you can ask for samples to check quality. We are willing to provide with sample for quality and function testing
Copyright © 2025 Dongguan Yifeng Metal Co., Ltd. | All Rights Reserved